Notice: This site currently shows the 2012/2017 edition of the Ontario Building Code. The current legally effective code is the 2024 edition (O.Reg. 163/24), in effect since January 1, 2025. Confirm current requirements at ontario.ca.

The Ontario Building Code | Grading of Backfill

9.12.3.2. Grading of Backfill

(1) Backfill shall be graded to prevent drainage towards the foundationafter settling.

In Plain Language

Backfill must be graded as set out in this article, generally sloping the ground away from the foundation to direct surface water away from the building.

This is a plain-language summary of the 2012/2017 Ontario Building Code text above, for general understanding only and not a substitute for the Code. Always confirm current requirements against the 2024 edition (O.Reg. 163/24) or a qualified professional before construction.