9.14.4.3. Grading

(1) The bottom of an excavation drained by a granular layer shall be graded so that the entire area described in Article 9.14.4.2. is drained to a sump conforming to Article 9.14.5.2.

In Plain Language

Granular drainage material must be graded (sloped) as set out in this article, directing water toward the drainage pipe rather than letting it pool.