Notice: This site currently shows the 2012/2017 edition of the Ontario Building Code. The current legally effective code is the 2024 edition (O.Reg. 163/24), in effect since January 1, 2025. Confirm current requirements at ontario.ca.

The Ontario Building Code | Subflooring Required

9.23.14.1. Subflooring="http://thehandyforce.com/flooring/" title ="Handyman flooring install Toronto">flooring Required

(1) Subflooring="http://thehandyforce.com/flooring/" title ="Handyman flooring install Toronto">flooring shall be provided beneath finish flooring="http://thehandyforce.com/flooring/" title ="Handyman flooring install Toronto">flooring where the finish flooring="http://thehandyforce.com/flooring/" title ="Handyman flooring install Toronto">flooring does not have adequate strength to support the design loads.

In Plain Language

Subflooring is required over floor joists, as set out in this article, providing a structural platform beneath the finished floor covering.

This is a plain-language summary of the 2012/2017 Ontario Building Code text above, for general understanding only and not a substitute for the Code. Always confirm current requirements against the 2024 edition (O.Reg. 163/24) or a qualified professional before construction.