The Ontario Building Code | Flashing
9.21.4.10. Flashing
(1) Junctions with adjacent materials shall be adequately flashed to shed water.
9.21.5. Clearance from Combustible Construction
In Plain Language
Flashing where a chimney passes through a roof must meet the requirements set out in this article, sealing this common point of roof leaks.
This is a plain-language summary of the 2012/2017 Ontario Building Code text above, for general understanding only and not a substitute for the Code. Always confirm current requirements against the 2024 edition (O.Reg. 163/24) or a qualified professional before construction.