Notice: This site currently shows the 2012/2017 edition of the Ontario Building Code. The current legally effective code is the 2024 edition (O.Reg. 163/24), in effect since January 1, 2025. Confirm current requirements at ontario.ca.

The Ontario Building Code | Continuity of Studs

9.23.10.4. Continuity of studs

(1) wall studs shall be continuous for the full storeyheight except at openings="http://thehandyforce.com/windows/" title ="Window installer in Toronto">openings and shall not be spliced except by finger-jointing with a structural adhesive.

In Plain Language

Studs must be continuous as set out in this article, avoiding splices that could weaken the wall's vertical load path.

This is a plain-language summary of the 2012/2017 Ontario Building Code text above, for general understanding only and not a substitute for the Code. Always confirm current requirements against the 2024 edition (O.Reg. 163/24) or a qualified professional before construction.