The Ontario Building Code | Bond Break

9.16.4.4. Bond Break

(1) A bond-breaking material shall be placed between the slab and footings or rock.

In Plain Language

A bond break, a layer preventing the slab from bonding to an adjacent structural element, is required under the conditions set out in this article, letting the two elements move independently.

This is a plain-language summary of the 2012/2017 Ontario Building Code text above, for general understanding only and not a substitute for the Code. Always confirm current requirements against the 2024 edition (O.Reg. 163/24) or a qualified professional before construction.