DIVISION 6 PLANS AND SPECIFICATIONS

PLANS AND SPECIFICATIONS

O.C. 364-2012, s. 1.

  • A contractor or owner-builder may not begin construction work, except maintenance, repair or demolition work, on an amusement ride or device, referred to in section 9.02, unless plans and specifications have been prepared for the work.


  • The plans must be drawn to scale and must, with the specifications, indicate the nature and scope of the work. The plans and specifications must include the manufacturer’s information and instructions on the erection and assembly of the amusement ride or device.

    The plans and specifications must be signed and sealed by an engineer within the meaning of the Professional Code (chapter C-26), authorized to do so.

    O.C. 364-2012, s. 1.

      1. Despite section 9.09, a contractor or owner-builder may begin alteration work required following the issue of a bulletin by the manufacturer on an amusement ride or device if the contractor or owner-builder has in his or her possession the manufacturer’s instructions, drawings and testing procedures concerning the work.

        O.C. 364-2012, s. 1.

      2. A contractor or owner-builder must, at the end of the construction work provided for in section 9.09, give the final plans of the amusement ride or device to the owner.

        O.C. 364-2012, s. 1.

        In Plain Language

        Before starting construction work on an amusement ride or device (other than maintenance, repair, or demolition), this clause requires a contractor or owner-builder to have scaled plans and specifications prepared, including the manufacturer's erection and assembly instructions, and signed and sealed by an authorized engineer. It also allows manufacturer-directed alteration work without new plans in some cases, and requires final plans to be handed over to the owner once construction is done.

        This is a plain-language summary of the Quebec Construction Code text above, for general understanding only and not a substitute for the Code. Always confirm current requirements against the official Publications Quebec text or a qualified professional before construction.